https://doi.org/10.1051/epjconf/202429601007
The construction of the sPHENIX detector and status of its commissioning
Brookhaven National Laboratory, Upton, New York, USA
* e-mail: eobrien@bnl.gov
Published online: 26 June 2024
sPHENIX is the first new major detector at RHIC in over twenty years. It is designed for pioneering studies of the Quark Gluon Plasma and Cold QCD phenomena using high-pT jet and heavy flavor probes with a broad kinematic reach and a capability to take large statistics sets of A+A, p+p and p+A data. sPHENIX construction was completed in April 2023. It was commissioned and took first Au+Au data in the RHIC 2023 Run. This paper describes the details of the detector design, challenges of sPHENIX construction, progress on the commissioning and first data from the RHIC 2023 run.
© The Authors, published by EDP Sciences, 2024
This is an Open Access article distributed under the terms of the Creative Commons Attribution License 4.0, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.